//LiveWall with Hedera `Neon’
LiveWall with Hedera `Neon’2018-12-27T12:00:47+00:00

Project Description

A vibrant selection of English Ivy invites visitors to this boutique bakery to relax and enjoy a treat.

This wall structure is hand-watered, and includes a rear-drain assembly.  The valve on the drain tube is opened at the time of watering to collect runoff water (which is minimal).  The planted wall requires watering typically once every 5-7 days.

Project Details

Categories: